San Diego Unified School District · San Diego County · November 3, 2026 California General Election

Measure M: SAN DIEGO UNIFIED SCHOOL DISTRICT REPAIR, STUDENT SAFETY, NO TAX RATE INCREASE MEASURE

55% [1]

The question on your ballot

To repair/upgrade all public schools, help retain/attract teachers by: • Repairing deteriorating roofs, plumbing, restrooms; • Providing safe drinking water; • Removing asbestos, lead paint, mold; • Upgrading outdated career/vocational, science, technology, engineering classrooms; shall San Diego Unified School District’s measure authorizing $3,500,000,000 in bonds at legal rates, levying $32 per $100,000 of assessed value, providing $204,000,000 annually while bonds are outstanding, requiring public spending disclosure, audits, citizens oversight, be adopted? [1]

Ballot question as printed in the San Diego County sample ballot and voter information pamphlet (ballot type 310).

Vote YES or NO on the question exactly as printed. 55%.

Official documents

The county publishes the impartial analysis and the arguments for and against as PDFs. ThinkBallot links them as published; it doesn't summarize them.

Ask about Measure M

Answers come only from the official text above, with quotes, and are checked by Bias Buster before you see them.

Written by an AI model from the official text and checked by Bias Buster. Quotes are official text.

← All propositions

Community discussion opens after the election.